In this paper, formula for calculating cover pressures of buried tunnel at different depth is deduced.
本文推导了不同掩埋深度的掩埋巷道顶板压力计算公式。
At the same time, the stability of big-span tunnel with influence factor such as section size, high-span ratio and depth is studied.
同时,论述了大跨度隧道的稳定性以及断面尺寸、扁平率和隧道埋深对稳定性的影响。
The paper did research on the thickness, depth, different spacing steel, and other bugs in the second concrete lining, through the model experiment of GPR in the highway tunnel lining detection.
本文通过地质雷达公路隧道衬砌检测的模型试验,研究了地质雷达检测二衬混凝土厚度、二衬中的不同深度,不同间距钢筋以及衬砌模型中的缺陷。
应用推荐