We must deal with the crude soft soil artificially in order to meet the demand of groundsill intension, distortion and anti-seismic etc.
为了满足地基的强度、变形和抗震等要求,必须对天然的软弱土地基进行人工处理。
The old joint can' t meet the demand of big shell distortion, and the performance of joint should be improved.
原有传爆接头已不适应壳体大变形的需要,需采取措施改进接头性能。
Once such a demand cannot be met, clipping distortion would be introduced and system performance degrades.
一旦这些部件的动态范围不能达到要求,会引起削波失真,系统通信质量下降。
应用推荐