... deformation parameter形变参数 deformation period形变周期 deformation potential形变势 ...
基于106个网页-相关网页
Tunnel surrounding rock deformation monitor is an important method for holding information of surrounding rock and controlling tunnel stability in the period of construction.
隧道施工过程中的围岩变形监测是掌握围岩的动态信息、确保施工期间隧道稳定性的重要手段。
In this paper we analyze these data and find that the deformation wave of long period comes from pre-movement before a strong earthquake.
本文就此进行了初步分析,认为强震前的预滑移可能产生这种长周期的形变波,它们对大震预报有一定意义。
In the late period, brittle rupture structures inherited and were superimposed on the early deformation fabrics.
晚期为脆性破裂构造,与早期变形组构具继承、叠加关系。
应用推荐