Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
The experiment datum indicates that this method can reduces the computed quantity greatly and guarantees accuracy of the target identification.
实验数据表明,该方法大大减少了计算量,保证了目标识别的准确度。
应用推荐