An approval (or Review or Verification) has a "subject" that explains the reason for the approval, a list of approvers, and a due date.
审批(或者审核或验证)具有解释审批原因的“主题”、审批人员列表和到期日期。
The results of the design verification, including identification of the design, method(s), the date, and the individual(s) performing the verification, shall be documented in the DHF.
设计验证的结果应当记录在设计历史文档中。 这些结果包括设计识别、方法学、日期和实施审核的人员。
应用推荐