The theory also can supply the basis in research of load adjustment of damaged electric system, power supply recovery in seismic area, safety assessment and damage mitigation of power system.
从而为震后快速的对电力系统进行负荷调整,使震区供电系统能较快的恢复电力供应,保证救援工作能快速开展,减少供电工程系统的损失提供理论分析依据。
It is not uncommon for climbs to continue with damaged or leaking hydraulic systems, out-of-adjustment or jammed guide rollers, often working in the dark and for extended hours.
攀登时,使用损坏或泄漏的液压系统,没有任何的调整,这并不鲜见。在黑暗中工作和延长工作时间是时有发生的。
应用推荐