According torequirement of the projectdesignandtests, EPSboard is finallychosenas the thermal insulationmaterial for the eternalexposedsurface of ThreeGorgesprojectdam and powerhouse.
Since USACE was already budgetarily hard-pressed to maintain the very valuable lock and dam infrastructure and no third party would build a network for a single application, we went back to the drawing board.