"- like situation" column, the names should be filled out the full name, project planning and construction permits, construction permits and Shi D drawings of the project name in the agreement.
“—般情况”栏内,工程名称应填写全称,与建设工程规划许可证、施工许可证及施丁图纸中的工程名称一致。
The minute control over materials made possible by 3-D printing could definitely make a difference in pre-fabricating materials for construction.
三维打印中实现的对材料的精细控制有可能颠覆建筑业的预制材料。
Purchaser will provide D-123 "vessel Standard" which supplements the above drawings and determines the detail construction of pressure vessels.
买方将提供D - 123“容器标准”作为上述图纸的补充,并决定压力容器的具体施工。
应用推荐