More importantly, tests that were run on build 3 and not rerun later in the cycle may have missed a defect introduced in builds 4 or later.
更重要的是,对构建3运行的并且随后不在循环中重新运行的测试可能会错过构建4或之后引入的缺陷。
If there is a test run or a test cycle that would identify a specific test to be completed in shorter durations or more frequent test phases, consider using test suites to track the effort.
如果有一个测试运行或者一个测试周期对一个指定测试的辨别要在一个更短的持续时间内或者更加频繁的被完成,那么请您考虑使用测试套件来跟踪这一努力。
Have a trial run of the route, especially if they walk or cycle.
对路线进行踩点,尤其是当他们徒步或骑自行车上学的时候。
应用推荐