rill cut and fill method 倾斜分层充填采煤法
under cut-and-fill method 下向胶结充填采矿法
cut and fill stoping method 分层充填采矿法
By means of initial strain method, the plastic problem in cut-and-fill mining is solved by integration equation.
本文采用了初应变法提出非线性问题的边界积分方程并指出了在充填采矿中的应用。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
The method discussed in this paper refers to the cut and consolidated fill method in which drilling is done by jumbo, broken ore moved by LHD unit and the filler transported by pipeline.
该采矿法指用台车凿岩、铲运机出矿和管道输送充填料的胶结充填采矿法。
应用推荐