The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper.
本文首次系统地对高拱坝坝身泄洪孔口、泄流过程以及坝下水垫塘的布置优化问题进行了讨论。
In the stability design of the bottom slab of stilling basin or water cushion pool for a long time past, a little attention was paid to the pulse load on the slab.
以往在消力池或水垫塘底板的稳定性设计中,很少注意板块上脉动荷载的作用。
The stability of a water cushion pool by the action of high water head and large flood-discharge power is one of the key technologies which relate to its safe operation.
高坝水头高、泄洪功率大,下游水垫塘的稳定性是其能否安全运用的关键性技术之一。
应用推荐