By use of 3D FEM simulation, the concrete placing process of the dam and powerhouse was simulated. The relative displacement between the dam and the powerhouse and the equivalent stress of the cushion pipe were calculated.
为研究亭子口水电站厂坝间设置垫层管的可行性,以厂房坝段、厂房以及钢管为研究对象,采用三维有限元仿真计算技术模拟厂房坝段以及厂房的浇筑和运行过程,计算得到厂坝间相对位移及垫层管段钢管等效应力。
参考来源 - 亭子口水电站厂坝间设置垫层管可行性研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐