Figure 3: Risk reduction (red curve) and value creation (green curve) during the project lifecycle.
图3:项目生命周期期间的风险降低(红色曲线)和价值创造(绿色曲线)。
The system is mainly composed of file module of reading data, creation module of NURBS curve, surface construction module, parameterization modifying module, data conversion module and user interface.
系统主要由读取数据文件模块、NURBS曲线生成模块、曲面构造模块、参数化修改模块、数据转换模块以及用户界面组成。
应用推荐