The crest of a flood is its highest point, or peak. Flash floods are dangerous because people downstream have no warning of the coming flood.
洪峰是洪水的最高点或顶峰。骤发洪水很危险,因为下游的人们没有得到洪水将至的警告。
The more reasonable position of hump crest is the point Where the hump platform connects with the vertical curvature of accelerating grade.
认为,峰顶设在连接峰顶平台与加速坡竖曲线的始端较为合理;
We present an eye-point related adaptive ocean surface mesh model for real-time simulating irregular long crest waves in navigation simulation system.
本文基于深水中的长峰波波浪模型,给出了视点相关的梯形海面网格自适应模型,能快速逼真的实时生成航海仿真系统中的多通道海浪。
应用推荐