·2,447,543篇论文数据,部分数据来源于NoteExpress
Through hydraulic model tests, the spillway crest profile was optimized so as to achieve the required capacity on one hand and to minimize the cost of the spillway crest and the new gate on the other.
通过水工模型试验,一方面优化溢洪道顶部轮廓,另一方面降低溢洪道顶部改造和新闸门的成本。
youdao
应用推荐
模块上移
模块下移
不移动