tyre-wheeled crane at port 港口轮胎式起重机
at call Terrain Crane 所有的地形起重机
Parting at Yellow Crane Tower 送孟浩然之广陵
So the wintering period of Hooded Crane at Chongming Dongtan is about 5 months.
因此,白头鹤在崇明东滩的越冬期约为5个月。
The conclusion derived is: it is possible to realize the integration of wave compensation and anti-oscillation and to develop special crane at current level technology.
最后得出结论:现有技术水平能够实现海浪补偿与防晃一体化,研制特种起重机是可行的。
This paper briefly introduces the proposal and construction of foundation treatment for rare-beam of container crane at Container Terminal, Yantai Port (Phase Three Project).
本文简要介绍了烟台港三期工程集装箱码头装卸桥后轨道梁基础处理方案的比选、优化,施工要点与实施效果。
应用推荐