method of time-cost tradeoff 时间
time-cost tradeoff function 时间成本平衡函数
time-cost tradeoff 时间成本平衡
time cost tradeoff 时间成本权衡法
discrete time-cost tradeoff problem 一种离散时间费用优
cost and effectiveness tradeoff criteria 费用和效能综合准则
It all boils down to a risk vs cost tradeoff.
最后还是归结到了对风险vs成本的权衡之上。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
To evaluate the cost/benefit tradeoff of our approach, which we call PBR-UP, we performed a case study in the context of a small software development project (an object-oriented information system).
为了评估我们的方法的成本/收益的权衡,我们称其为 PBR-UP,我们在一个小的软件开发项目环境中做了一个案例研究(一个基于对象的信息系统)。
应用推荐