Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this cost, which shall be included in the Contract Price.
在接到通知后,工程师应依据第3 . 5款【决定】,对此费用作出商定或决定,并将之加入合同价格。
The former involved the barrier clause in a contract and the latter involved the cost of default, so the latter model demands a recovery period.
结构化模型的扩展主要有首达时模型和偏移模型,前者考虑了契约中的障碍条款,而后者考虑了违约的成本,因此要求给予公司一个恢复期。
On receipt of the notice under Clause 54, the Contractor shall remedy the defect without undue delay and at his own cost as stipulated in Clauses 51-65 inclusive.
一旦收到54款中所述通知后,承包方应毫不拖延地按照第51 - 65款规定对瑕疵进行补救,费用由其自理。