Requirements volatility: Changing requirements that impact delivery schedules and increase software rework and cost.
需求变化:变更需求将会影响交付的时间表并增加软件返工和成本。
Through active promotion of the standard, production and construction requirements on power material procurement are met in quality, quantity and delivery schedule and the procurement cost is lowered.
通过积极推行标准,达到保证电力物资采购在质量、数量、供贷时间上满足生产,建设的要求,并降低了采购成本。
应用推荐