By simulating analysis, the optimal parameters, Numbers and type of construction machinery can be obtained, and the smallest cost and shortest period of construction projects can be predicted.
通过仿真分析,可以对施工机械的机型、数量以及作业参数作出最佳选择,并且预测出施工的最短工期和最低施工费用。
This paper presents an analysis and methods of calculation for the static and dynamic characteristics of a low cost moving-coil high pressure type electrohydraulic servo valve.
本文介绍一种成本低的动圈式高压电液伺服阀的静、动态特性的计算与分析。
This paper puts forward a storage type decision-making technique based on cost analysis, and its decision basis is storage cost of logistics system.
本文提出的是一种基于成本分析的仓储类型决策方法,其决策依据就是物流系统的仓储成本。
应用推荐