Schedules for remotely developed subsystems often slipped, even with a capable team at the remote site, because they didn.t have access to the same resources that the core engineering team did.
对于远程开发的子系统的计划经常不能按时完成,因为远程的开发团队不能访问和核心工程团队一样的资源。
Acquiring the necessary core and specialist team members and support facilities for the time and input required.
获得必要的核心及专家团队成员,以及对时间和输入的支持。
The plot: When Mother Earth's molten core stops spinning for unknown reasons, a team of scientists must go to the centre and detonate a hydrogen bomb to get it to spin again.
主要情节:当大地之母的核心不是什么原因停止转动时,一队科学家们必然要去中心并且要引爆它使它再一次转动。
应用推荐