Work stealing thus produces reasonable load balancing with no central coordination and minimal synchronization costs.
因此,工作窃取实现了合理的负载平衡,无需进行协调并且将同步成本降到了最小。
Online calculation of heat to power output efficiency of thermal generator set is important for the load coordination control in the CFB boiler thermal generator set.
为解决循环流化床锅炉发电机组负荷变化时的机炉协调控制问题,需要对发电机组的热功效率进行在线计算。
So based on the condition of displacement coordination, a method which can consider the effect of the cap sharing the load to predict the settlement of pile groups with low caps is advised.
本文考虑承台—桩—土的共同作用,根据位移协调条件,在高承台桩基沉降计算方法的基础上提出考虑承台分担荷载作用的低承台桩基沉降计算方法。
应用推荐