The optimal operation plan of cascade pumping stations is solved by means of decomposition-coordination model.
本文采用大系统分解-协调模型,对梯级泵站联合运行时的优化方案进行了求解。
The plan of the foundation shape should be designed by the compression stress distribution at the foundation bottom, for the coordination action of the walls.
由于墙体的共同工作,应按基础底面压应力的分布特点确定基础外形方案。
Accompanied by diversification and integration of taking part in force and means, organizing plan of CPFES is very complexity, difficulty of coordination control is added.
随作参与力量和手段多样化、综合化,制电磁权斗争的组织计划复杂,协调控制难度增大。
应用推荐