Pipe cooling is one of the most temperature control measures of concrete of arch DAMS.
水管冷却是拱坝混凝土的主要温控措施之一。
The vertical direction of the mold, vertical feeding, can not afford to arch, and equipped with air cooling system, easy to heat.
①、模具立向,垂直进料,不起拱,并备有风冷系统,容易散热。
So the utility model provides an arch-shaped filler plate, which can be fixedly clamped on the filler suspension frame in the cooling tower via an entire full-plastic fixing clamp.
为此,本实用新型提供一种拱形填料板,通过整体式全塑固定卡夹将其卡夹固定在冷却塔内的填料吊架上。
应用推荐