Considering the critical components like reactor coolant lines and oil-well casings, the metal parts are subjected to prior replacement, for safety, with respect to a worst-case analysis of failure.
考虑到关键部件如反应堆冷却剂线和油井涂层不能出现问题,为了安全,并对失效做了最坏的分析,这类金属零件会得到优先更换。
The test and analysis about the vibration damping and noise reduction of the canned coolant pump are studied.
对核动力装置屏蔽式冷却剂泵的减振降噪进行了测试与分析。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
应用推荐