After install the control apparatus of fire monitor, execute test for directs.
消防炮的控制装置安装后,动作指令的测试。
To monitor and fully implement the portion control established with the recipe CARDS and the butcher test. To minimize waste and spoilage.
监督并全面实施根据配料卡和分肉试验而进行分量控制,使浪费和变质最小化。
The test equipment, control and monitor equipment, tilting mechanism of the tilting passenger cars are analyzed. The suggested development scheme is put forward.
对摆式客车检测装置、控制和监视装置、倾摆机构等进行了分析,提出了建议采用的研制方案。
应用推荐