By using some transfer formulae, we may figure out the control point which is impossible for the surveyors to survey directly in engineering survey.
在工程测量中,可以用转换公式计算测量人员无法直接施测的控制点。
Problems concerned with the optimum design, precision estimation and control point positioning of the control network in construction survey of a power plant are introduced.
文中介绍某电厂施工测量中有关控制网的优化设计、精度估计及控制点位放样方法等问题。
In the case of no control point, we can use localization function and line stake function of RTK technique in transmission line final location survey.
在没有控制点的情况下,利用rtk技术提供的在任意点上地方化功能和线放样功能进行线路终勘定位。
应用推荐