The application of the middle line method of dam construction and the tailing transportation using water isolation pumps are an effective way.
采用大坝中线法施工,采用隔水泵输送尾矿是一种行之有效的方法。
The construction of groundsill for the line and the water, electricity, gas, oil, material for testing, cables for connecting machines etc. are provided by the customers.
建筑地基的线及水,电,气,油,材料测试,电缆连接机器等,都提供了客户。
A concrete construction simulation and management system is developed for Danjiangkou Dam heightening project as part of median-line of south-to-north water transfer project in the paper.
以南水北调中线丹江口大坝加高工程为背景,开发了丹江口大坝加高工程混凝土浇筑施工模拟与管理系统。
应用推荐