It presents the computation models of different construction conditions, based on construction sequence and technologies.
根据施工顺序和施工工艺,确定不同工况下计算模型。
参考来源 - 大跨径桥梁混凝土索塔施工及横梁支撑体系设计与计算By the analysis of financial evaluation and social benefit estimate, it proves the feasibility of construction sequence.
通过财务评价和社会效益评价分析,证明建设时序的可行性。
参考来源 - 重庆市轨道交通建设时序研究·2,447,543篇论文数据,部分数据来源于NoteExpress
At last, this article brings up five models about the region road network construction sequence.
最后,本文提出了区域公路网建设序列的五种模型。
It presents the computation models of different construction conditions, based on construction sequence and technologies.
根据施工顺序和施工工艺,确定不同工况下计算模型。
Based on analysis on the two aspects as construction sequence and proper distance, the practical construction scheme is optimized.
从施工顺序和合理间距两方面进行数值分析,从而使得实际隧道施工方案得到优化。
应用推荐