The text expatiate the tenet and method that should be follow to control project cost during pre design and detailed design for construction section.
阐述了在初步设计和施工图设计阶段控制工程造价应遵循的原则与方法。
Construction should be fully prepared, the construction section of the pile position to find accurate. Lofting should be accurate, the error in the specified range.
施工准备应充分,施工路段桩号位置找准确。放样应精确,误差在规定范围内。
Another, from the section on construction play: “Lay a toy on the floor and figure out how to build a bridge going over the toy with blocks.
另一个建筑游戏是这样的,“放一个玩具在地上,想想如何用积木搭一座桥越过这个玩具。”
应用推荐