The integrated design and construction team had to plan ahead, workshop collectively and cooperate in ways that were unconventional to the normal design and construction process.
整体设计建造团队必须提前计划,共同工作,以某些方式进行合作,这些方式对于标准的设计建造过程来说是不合常规的。
The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.
介绍了应用计算机技术实现基本建设过程计划进度控制和跟踪管理的理论及实践。
Construction process in strict accordance with the construction plan execution, summarizes and improve frame bridge station construction technology and wear both deficiency.
施工过程中严格按照施工方案执行,总结并改进框架桥下穿既有站场施工工艺和存在的不足。
应用推荐