construction of cable pylon 索塔施工
Construction of cable changes 换索施工
the construction of cable-stayed bridge 斜拉桥施工
construction of anchor cable 锚索施工
construction of stayed-cable 斜拉索施工
Construction Technology of Bolt-Belt-Net-Cable Supporting 锚带网索支护施工工艺
construction of fiber ribbon cable 带状光缆结构
design of cable construction 电缆结构设计
The methods in this paper can be used in the design and construction of cable structures.
本文的拉索滑移处理方法可用于索结构的设计与施工。
Climbing-frame is often used in the high-tower construction of cable-stayed or cable-suspended bridge, but seldom used in common pier construction.
爬架施工一般应用于斜拉桥或悬索桥的高塔塔柱施工,而很少用于一般墩身施工。
In construction of cable tower of cable-stayed bridge, whole vertical-rotation lifting method can reduce difficulty in assembly of cable tower structure at high altitude.
采用整体竖转的施工方法进行斜拉索桥倾斜索塔的吊装,可降低索塔结构的高空拼装工作难度。
应用推荐