Also note that the Construction phase is evenly balanced across each team member, while the workload shifts in the Transition phase as expected.
还要注意构建阶段是平稳穿过每个小组成员的,而产品化阶段的工作量班次在预期之内。
Note that the way we pick what to work on in Construction is quite different from Elaboration.
注意我们所选择在构建阶段进行工作的方式与细化阶段是不同的。
Note the manner in which the individual projects interact with the service portfolio by drawing from it during the Elaboration phase and then contributing to it during the Construction phase.
注意单个项目与服务组合交互的方式,在项目的细化阶段从单个的项目中提取需要组合的服务,在项目的构造阶段组合的服务被实现。
应用推荐