... construction features ==> 构造特点 construction finished ==> 已完工程 construction flow process ==> 流水作业施工 ...
基于1个网页-相关网页
Pre-fabricated Pre-finished Volumetric Construction 工厂预制体积建设
Construction has been finished 已建成
finished construction detail 成品结构
finished construction 成品结构 ; 已完施工
Construction been finished 已完工
Therefore, It is of great importance to design a reliable structural health monitoring system after construction finished.
因此在大跨桥施工完成后建立一套可靠的结构健康监测评估系统是尤为必要的。
The early-time damage of asphalt pavement is not only owing to design and construction of pavement, but also owing to the usage, maintenance and management after the construction finished.
沥青路面的早期破坏,不仅与设计、施工等路面形成前的环节有关,而且与路面形成后的使用、养护和管理联系紧密。
The observation results show that the building up of the beam model provided exact data for the construction control, which can ensure that the main tower construction finished successfully.
监测结果表明,该模型的建立为桥塔的施工监控提供了准确的数据,保证了主塔施工的顺利完成。
应用推荐