As in RUP, the construction of the use-case model is central to our reverse-engineering process.
如同在RUP中一样,用例模型的构造对我们的逆向工程过程是重要的。
In different engineering geological conditions, the construction process, the migration of overlying strata have different rules.
在不同工程地质条件下,施工过程中覆岩具有不同的运移规律。
Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.
摘要:在工程建设过程中,由于各种原因,工程变更的情况时有发生。
应用推荐