go top

construction control

  • 施工控制

网络释义专业释义

短语

bridge construction control survey [交] 桥梁控制测量

construction control network [建] 施工控制网

the construction control 施工控制

construction control survey 施工控制测量

construction control network for building 建筑物平面控制网

construction control test 施工控制试验

construction control index 施工控制指标

construction control technique 施工控制技术

construction control survey network 施工控制网

construction control methods 施工控制方法

 更多收起网络短语
  • 施工控制 - 引用次数:906

    cable curve,segmental catenary,construction control,nonlinear finite element analysis,improved iterative method

    主缆线形,分段悬链线,施工控制,几何非线性有限元分析,改进的迭代法。

    参考来源 - 大跨度悬索桥空间几何非线性分析与软件开发
    施丁控制 - 引用次数:1

    参考来源 - 钢管混凝土拱桥施工控制关键技术研究 Study of Key Construction Control Technique of Steel Pipe Concrete Arched Bridge
  • 施工控制 - 引用次数:33

    The core of study is construction control.

    施工控制是本文的核心部分。

    参考来源 - 住宅装饰装修工程优化控制系统——全面质量管理原理在系统中的应用
    建设控制 - 引用次数:4

    On the basis of it, the paper establishes the construction control frame which the managing control carrier is dividing managing areas.

    在此基础上,文章从建设与保护的哲学辩证关系入手,架构以管理分区为管理控制载体的建设控制框架。

    参考来源 - 风景名胜区总体规划的建设控制研究

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句权威例句

  • Therefore, the method proposed in this thesis has some reference value for the long-span suspension bridge construction control.

    因此,文中提出的方法,对大跨度悬索桥的施工控制具有一定的参考价值。

    youdao

  • This method can be used in form-finding and construction control on main cables of suspension bridge and other long-span cable structures.

    该方法不仅可以应用于悬索桥主缆的找形,同样也适用于其它大跨缆索结构的找形和施工控制。

    youdao

  • To ensure the quality and security of the prestressed concrete continuous rigid frame bridge, construction control was of great importance.

    为了保证大跨径连续刚构桥悬臂施工的质量和安全,施工控制是非常重要的。

    youdao

更多双语例句
  • Officials who once hoped to launch the museum last September had to push the date back to late 2013 or early 2014 because of disputes between the mayor and the governors of New York and New Jersey over construction costs and control of the site.

    WSJ: Protecting 9/11 Artifacts From Floods

  • Through the Presidential Memorandum, the President directed agencies to expedite environmental reviews and permit decisions for a selection of high priority infrastructure projects that will create a significant number of jobs, have already identified necessary funding, and where the significant steps remaining before construction are within the control and jurisdiction of the federal government and can be completed within 18 months.

    WHITEHOUSE: Our Top Stories

  • He says the building was poorly constructed and that the person in charge of quality control for the construction took bribes.

    NPR: Shoddy Work, Leadership Blamed in School Collapse

更多权威例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定