It presents the computation models of different construction conditions, based on construction sequence and technologies.
根据施工顺序和施工工艺,确定不同工况下计算模型。
Construction conditions: Construction of the surface must be dry, the temperature at 5 degrees Celsius, relative humidity less than 80%.
施工条件:施工表面必须干燥,气温在5摄氏度以上,空气相对湿度小于80%。
But because of some factors, such as geological conditions, characteristics of works, construction conditions and economic indicator etc.
但由于地形地质、工程特点、施工条件及经济等因素,一些工程不得不修建弯曲溢洪道。
应用推荐