First of all, presents Temporal Partial-Global Planning (TPGP) based on the part with time constraint, and accomplish global constraint.
首先,提出了基于时间约束的部分-全局计划(TPGP),实现了全局约束。
Based on the analysis of satellite's function and payload's resource constraint, a planning and scheduling method for earth observation satellite is proposed to solve the problem in the paper.
本文以对地观测卫星的有效载荷系统为例,分析了卫星的资源特点和载荷的工作特性,在此基础上提出了一种有效载荷规划与调度的方法。
In contrast, this paper describes a network planning tool that USES a fundamental mechanism within a constraint-based planning engine.
相比之下,本文描述了网络规划工具,在基于约束规划引擎使用一个基本机制。
应用推荐