The project manager: shall responsible for the confirmation of the that is the structure and package new materials.
总工程师:负责电子材料类新物料承认书的审批,或代替项目经理审批新物料承认书。
Confirmation of structure based on e. g., synthetic route and spectral analyses should be provided.
应提供基于,如,合成路线和光谱分析的结构确认。
The key of loading structure method is the confirmation of lining loads.
荷载结构法计算的关键在于衬砌荷载的确定。
应用推荐