The concrete construction technology for permanent drainage gallery of Xilongchi Pumped Storage Power Station upper reservoir is introduced herein.
详细地介绍了西龙池抽水蓄能电站上水库库底永久排水廊道混凝土的施工技术。
The general notes herein are for steel structure work of This Project, and foundation and reinforced concrete work see concrete structure Design notes.
本说明为本工程钢构部分说明,基础及钢筋混凝土部分详见混凝土结构设计说明。
The concrete work of herein is as follows:1. Using ANSYS analyze the reaction of pile-wharf with knuckle in straight pile and usually pile-wharf in horizontal earthquake.
运用ANSYS分析了直桩桩顶铰接和直桩桩顶固接桩基码头在水平地震作用下的动力反应。
应用推荐