Completion times vary but, on average, are between six months to two years.
虽然完成时间不同,但是大概都需要六个月到两年的时间。
The problem of uniform parallel machine scheduling was considered so as to minimizing total completion times.
研究了目标函数是最小最大完成时间的同类机调度问题,其中作业到达时间可能不同。
This paper considers the cross docking distribution scheduling problem, with the objective to minimize the total weighted completion times.
提出并研究两台机器环境下的以带权总完工时间为目标函数的越库配送排序问题。