Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
More samples are taken during completion operations and then from produced oil and water during production.
大多数的样品来源于完井作业以及生产过程中的油、水混合物。
For low permeability micro - fractured reservoirs drilling and completion operations, the solid phase invasive, stress-sensitive, water trapping is the main damage mechanism.
对于低渗微裂缝储层钻井完井作业而言,固相侵入、应力敏感、水相圈闭是主要损害机理。
应用推荐