Drill pipe blocking and sticking frequently occur during completion logging in Zhongyuan Oilfield, and this seriously impacts the accuracy of logging results.
中原油田完井电测施工中常常出现遇阻、遇卡等问题,严重影响电测结果的准确度。
This well employed Measured While Drilling, geologic followup, screw drill direction technology and DF-1 multilateral well completion technology.
该井采用了地质跟踪、无线随钻测量技术、螺杆钻具定向技术与DF - 1多分支井完井技术等。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
应用推荐