This paperintroduces the managementof such links as projectmeasurementverification, project alteration andcompletionauditrelating to engineeringproject cost,.
Audit requirements are satisfied by including with every electronic document a separate certificate of completion and a legally binding audit trail with the identity of the signer, a time stamp, and location information.