For the purpose of practical use a unit commitment method considering transmission losses and line overload constraint is proposed in this paper.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
In this paper, the probabilistic technique is used to evaluate the spinning reserve requirements of the system, that is, the reliability constraint is considered in the model of unit commitment.
论文拟用概率方法评估系统的旋转备用,即在机组最优启停模型中引入可靠性约束。
应用推荐