The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
验收时间:验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The Company can be carried out at a variety of machine oil purifier, trial and the automatic control system installation, commissioning and maintenance.
本公司可进行各种分油机的拆检,试验以及自动控制系统的安装,调试,检修。
应用推荐