Combining with field practice,“close to zero flow method”is brought to tap remaining oil potential in water-flooded layer from second reservoir-forming in well-bore. It is main purpose that the method of batch production or reducing liquid-producing capacity are taken to develop the layers of super-high water cut well or future abandonment well.
基于1个网页-相关网页
Theories derive from practice as well as guide them, especially in the economic field. Therefore, the third method is substantial proof combining theories with practice.
理论来源于实践又必将指导实践,尤其在经济领域更是如此,因此,理论联系实践的实证分析法是本文的第三种研究方法。
An engineering computing method based on the combining ANSYS with a code of field-match method is present, which is valuable in engineering practice and co...
同时,在ANSYS计算基础上结合区域匹配方法,提出了一种新的工程计算方法,在实际工程中使用具有很好的应用价值。
应用推荐