And combine the project instance, carry on comparative analysis.
并结合工程实例,进行比较分析。
Finally, combine the instance bridge measure, through analysis of the result of static load and dynastic load, it further proved the method of attached load is feasibility and superiority.
最后,结合桥梁检测实例,通过对附加荷载作用下的静测和动测试验结果的分析,进一步证明的附加荷载动测法的可行性及优越性。
应用推荐