·2,447,543篇论文数据,部分数据来源于NoteExpress
This paper puts forward the design argument of the scheme of fast construction applying hydraulic shrinkage-compensating concrete for the upper coffer-wall of a station.
本文结合某电站上游围堰,对水工补偿收缩砼快速施工进行设计论证。
youdao
应用推荐
模块上移
模块下移
不移动