stability of coal pillar 煤柱稳定性
The factors affecting coal pillar stability are discussed, and the technical way reducing coal pillar size and enhancing recovery ratio is put forward by means of rock bolting.
本文探讨了影响煤柱稳定性的因素,提出了采用锚杆支护加固煤柱减小煤柱尺寸提高房柱式采煤回采率的技术途径。
参考来源 - 房柱式开采煤柱设计及锚固法煤柱加固技术研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The factors affecting coal pillar stability are discussed, and the technical way reducing coal pillar size and enhancing recovery ratio is put forward by means of rock bolting.
本文探讨了影响煤柱稳定性的因素,提出了采用锚杆支护加固煤柱减小煤柱尺寸提高房柱式采煤回采率的技术途径。
The stability of goaf-side roadways depends on not only the abutment distribution, but also the fracturing degree of the coal seam and rock strata alone the pillar width.
一侧采空巷道稳定性不仅与支承压力分布有关,而且与煤体受破坏程度有关。
The stability of coal pillar of the short-wall mining was analyzed systemically by numerical simulation with the rock failure process analysis software (RFPA2D).
采用岩石破裂过程分析软件RFPA2D系统,对短壁机械化开采的煤柱稳定性进行数值计算与分析。